Abdirad, H and Dossick, C S (2019) Normative and descriptive models for COBie implementation: discrepancies and limitations. Engineering, Construction and Architectural Management, 26(08), 1820–36.

Almarri, K, Alzahrani, S and Boussabaine, H (2019) An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Engineering, Construction and Architectural Management, 26(08), 1696–711.

Anson, M, Ying, K T and Siu, M F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(08), 1672–95.

Antwi-Afari, M F, Li, H, Wong, J K, Oladinrin, O T, Ge, J X, Seo, J and Wong, A Y L (2019) Sensing and warning-based technology applications to improve occupational health and safety in the construction industry. Engineering, Construction and Architectural Management, 26(08), 1534–52.

Au-Yong, C P, Chua, S J L, Ali, A S and Tucker, M (2019) Optimising maintenance cost by prioritising maintenance of facilities services in residential buildings. Engineering, Construction and Architectural Management, 26(08), 1593–607.

Charkhakan, M H and Heravi, G (2019) Evaluating the preventability of conflicts arising from change occurrence in construction projects. Engineering, Construction and Architectural Management, 26(08), 1777–800.

  • Type: Journal Article
  • Keywords: Risk management; Construction; Project management;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-09-2018-0361
  • Abstract:
    Although several studies have evaluated effective factors for conflict occurrence, researchers have developed few methods of determining preventive capacities and determining preventive measures on the basis of an analysis of chain of risks that cause conflict. The purpose of this paper is to devise a mechanism for conflict prevention by evaluating chain of risks that cause conflict and different conflict types. Design/methodology/approach Efforts centered on facilitating the prevention conflicts through analyzing the effects of chain of risks on change causes, decomposing the mixture of conflict types in each conflict and determining the contribution of each conflict type to conflict creation. Findings The paper expands the existing body of knowledge on conflict management through the determination of complex relationships, namely, the relationship between conflict causes and project parties and the coherence between project parties and conflict types. Originality/value A practical example is analyzed to demonstrate the proposed approach capabilities. The results showed that using the developed approach to determine conflict type can serve as a means of control in projects and the developed approach can be incorporated into construction contracts as a conflict resolution mechanism. This paper presents an understanding of complex relationships among the chain of risks which cause conflict, the important players in conflict management process and different conflict types. It also provides a basis to select an effective management method for each conflict.

Gao, J, Ren, H, Ma, X, Cai, W and Shi, Q (2019) A total energy efficiency evaluation framework based on embodied energy for the construction industry and the spatio-temporal evolution analysis. Engineering, Construction and Architectural Management, 26(08), 1652–71.

He, Q, Wang, T, Chan, A P, Li, H and Chen, Y (2019) Identifying the gaps in project success research. Engineering, Construction and Architectural Management, 26(08), 1553–73.

Hilali, A, Charoenngam, C and Barman, A (2019) Barriers in contractual scope management of international development projects in Afghanistan. Engineering, Construction and Architectural Management, 26(08), 1574–92.

Hopkin, T, Lu, S, Sexton, M and Rogers, P (2019) Learning from defects in the UK housing sector using action research. Engineering, Construction and Architectural Management, 26(08), 1608–24.

Jin, R, Zou, Y, Gidado, K, Ashton, P and Painting, N (2019) Scientometric analysis of BIM-based research in construction engineering and management. Engineering, Construction and Architectural Management, 26(08), 1750–76.

Liang, R and Chong, H (2019) A hybrid group decision model for green supplier selection: a case study of megaprojects. Engineering, Construction and Architectural Management, 26(08), 1712–34.

Murillo, K P, Rocha, E and Rodrigues, M F (2019) Construction sectors efficiency analysis on seven European countries. Engineering, Construction and Architectural Management, 26(08), 1801–19.

Park, E, Kwon, S J and Han, J (2019) Antecedents of the adoption of building information modeling technology in Korea. Engineering, Construction and Architectural Management, 26(08), 1735–49.

Rajagopalan, G (2019) Durability of alumina silicate concrete based on slag/fly ash blends against corrosion. Engineering, Construction and Architectural Management, 26(08), 1641–51.

Silverio-Fernandez, M A, Renukappa, S and Suresh, S (2019) Evaluating critical success factors for implementing smart devices in the construction industry. Engineering, Construction and Architectural Management, 26(08), 1625–40.